Week Sixteen – Wednesday

The flooring guys

The flooring guys

The floorboards are almost finished. We used 4″ x 5/8″ western red cedar screwed to white oak battens. Each of the sections will be removable so the bottom of the boat can be sponged dry.

Western red cedar floorboards

Western red cedar floorboards

The trailer assembly was completed today enabling us to move the boat from the building frame onto the trailer. The transfer was very easy with the shop’s overhead track and hoists.

Final assembly of the trailer

Final assembly of the trailer

Boat suspended in slings awaiting the trailer

Boat suspended in slings awaiting the trailer

Trailer and boat meet

Trailer and boat meet

Advertisements

One thought on “Week Sixteen – Wednesday

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s