Week Four

(Left) Marking the plank landings on inner stem         (Right) Device for locating the inner bevel line

(Left) Marking the plank landings on inner stem (Right) Device for locating the inner bevel line

Using straightedge to check stem where it meets the hog

Using straightedge to check stem where it meets the hog

This week was all about the stems and the hog. Both got their initial shaping on the bench with the power plane before being placed on the moulds for additional shaping. After checking to make sure everything was aligned we then epoxied the hog to the stems and the frames. Next week, after fine tuning all the bevels, we’ll get started on the planking.

Hog gets initial shaping on the bench and then on the building setup

Hog gets initial shaping on the bench and then on the building setup

The hog gets epoxied to stems and frames

The hog gets epoxied to stems and frames

Advertisements

2 thoughts on “Week Four

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s